Complete guide to king post retaining walls (UK).

Direct answer: A king post retaining wall uses steel UC posts set into bored concrete piles, with precast concrete panels infilled between the flanges. It is fast to install, modular, suits retained heights to 4m (13'1"), and is designed to BS EN 1992 (concrete) and BS EN 1993 (steel) with embedment per BS 8002.

By WCCP Engineering Team
Published
Updated
On this page
  1. When to use king post
  2. UC post sizing
  3. Infill panel thickness
  4. Drainage
  5. Design to BS EN 1992
  6. Install sequence
  7. Common mistakes
  8. FAQ

When should you choose a king post wall?

King post walls win where retained height is between 1.8m (5'11") and 4m (13'1"), where the toe is constrained, and where speed of install matters more than absolute material economy. They are routine on highway widening, basement perimeters, farm-track cuttings and any job where an L-block would need too much footprint.

Compared with a cast in-situ cantilever wall, king post is faster — once the piles are in, the panels drop in over a few days. Compared with sheet piling, it is more permanent and reads as a finished wall. Compared with gabions, it has the structural and visual properties that planners prefer in a development setting.

Where it loses: in very tall retained heights (above 4m (13'1"), contiguous bored pile or anchored designs typically dominate) or where the ground will not take a piled foundation (running sand, deep soft alluvium). Talk to us early on borderline jobs.

How are king post UC sections sized?

UC sizing is an engineer's calculation against retained height, soil shear strength, surcharge, groundwater and embedment depth — typically 1.5× the retained height for cohesive soils and 1.7× for granular. A typical 3m (9'10") retained height with no vehicle surcharge in a stiff clay sites at UC203×203×46 at 1.8m (5'11") centres, embedded 4.5m (14'9") into a 600mm (2ft) bored pile.

The maths is straightforward but unforgiving. The post is designed as a propped or free-standing cantilever depending on whether there is a top capping beam or anchor. Bending moment scales with the cube of retained height; shear with the square. Doubling the height does not double the section — it roughly multiplies it sevenfold.

We design every WCCP king-post job in-house to BS EN 1993-1-1 (steel) and BS EN 1992-1-1 (concrete piles and panels), with the geotechnical input from your site investigation.

What thickness should the infill panels be?

For 1.8m (5'11") post centres, 140mm (6in) panels suit retained heights to 2.4m (7'10"), 180mm (7in) to 3.0m (9'10"), 200–230mm (8–9in) to 3.6m (11'10"), and above 3.6m (11'10") the design becomes site-specific. Wider post centres demand thicker panels — span between posts and panel thickness scale roughly together.

Retained heightPanel thicknessPost centresConcrete grade
To 1.8m (5'11")120mm (5in)1.8m (5'11")C40/50
1.8m (5'11") – 2.4m (7'10")140mm (6in)1.8m (5'11")C40/50
2.4m (7'10") – 3.0m (9'10")180mm (7in)1.8m (5'11")C40/50
3.0m (9'10") – 3.6m (11'10")200–230mm (8–9in)1.5m (4'11")C40/50
Above 3.6m (11'10")BespokeBespokeC40/50

WCCP standard range. Surcharge from vehicles within 1.5m (4'11") of the wall steps thickness up.

How do you drain a king post wall?

Every king post wall needs a 150mm (6in) perforated land drain at the base of the retained face, wrapped in geotextile, surrounded by 200mm (8in) of clean 20mm (¾in) aggregate, with weep holes through every third panel at low level. Hydrostatic pressure behind a blocked wall doubles the design earth pressure. Drainage is the cheapest insurance you will ever buy.

Above the drain we specify a clean granular backfill or no-fines concrete to within 300mm (1ft) of finished level, with the granular cap topped by a low-permeability cohesive layer to shed surface water away from the retained face.

Design to BS EN 1992 and BS EN 1993.

UK king-post walls are designed to BS EN 1992-1-1 (Eurocode 2) for the concrete elements (piles, panels, capping beam) and BS EN 1993-1-1 (Eurocode 3) for the steel UC. Earth pressures follow BS EN 1997-1 (Eurocode 7) and BS 8002. BS 8500-1:2023 governs concrete specification — typically C40/50 with exposure class XC2 / XC3.

Every WCCP panel is manufactured to BS EN 14992; conformity documentation is available on request, and the structural calc, mix cert and cube tests follow as a single PDF pack.

Install sequence — typical week.

  1. Set out and bore piles to design depth (usually 1.5–1.7× retained height).
  2. Drop UC king posts into wet pile concrete; brace plumb until the pile sets.
  3. Excavate retained face down in 1m (3'3") lifts, dropping panels as you go.
  4. Land each panel into the UC flanges; spacers maintain joint width for the sealant.
  5. Install drainage and granular backfill behind each lift before excavating the next.
  6. Cast capping beam if the design calls for one; commission and snag.

On a typical 30m (98'5") run at 3m (9'10") retained height, allow a week for piles, three days for posts to cure and brace, and two to three days to drop the panels and backfill.

Common mistakes on king post jobs.

  • Skipping the drainage. The single biggest cause of king-post failures. Hydrostatic load can double the design earth pressure overnight in heavy rain.
  • Wrong embedment depth. Embedment is sized by the engineer, not by rule of thumb. Short piles overturn — usually within five years of build.
  • Vehicle surcharge ignored. If a tractor or HGV will run within 1.5m (4'11") of the top of wall, the design has to allow for it. Tell us at design stage.
  • Joint sealant skipped. Sealant between panels is what stops fines piping out through the wall. It's a cheap line item — don't value-engineer it away.
  • Wrong concrete grade. C32/40 is not appropriate for retained-earth duty in our climate. We cast every panel in C40/50 to BS 8500-1:2023.

Frequently asked questions

What is a king post retaining wall? +

A king post retaining wall is a steel-and-concrete retaining system. Steel universal columns (UCs — the "king posts") are set into a row of bored concrete pile foundations. Precast concrete panels then drop into the flanges of each UC to form the wall face. The system is fast to install, modular and well suited to retained heights up to about 4m (13'1").

What size UC do I need for a 3m king post wall? +

For a 3m (9'10") retained height in cohesive soil with no surcharge, a UC203×203×46 at 1.8m (5'11") centres is a typical starting point — but the actual section is sized by the structural engineer against soil parameters, surcharge, groundwater and embedment depth. We design every WCCP king-post job to BS EN 1992 and BS EN 1993.

How thick should the infill panels be? +

Panel thickness is driven by retained height and surcharge between the posts. For typical 1.8m (5'11") post centres, 140mm (6in) panels work to 2.4m (7'10"), 180mm (7in) to 3.0m (9'10") and 200–230mm (8–9in) above 3m (9'10"). Heavy surcharge from vehicles or stockpiles steps the thickness up.

How much drainage does a king post wall need? +

Drainage is non-negotiable. We specify a 150mm (6in) perforated land drain wrapped in geotextile at the base of the retained face, surrounded by 200mm (8in) of clean 20mm (¾in) aggregate, with weep holes through every third panel at low level. Hydrostatic pressure behind a blocked wall doubles the design load.

What is the lead time on a king post wall? +

Catalogue panels and stock UC sections, four to five weeks from approved drawing. Bespoke heights, dished panels or non-standard post centres add a fortnight for design and mould prep. Bored piles are usually the critical path — book the piling rig early.

Designing a king post wall?

Send us your retained height, plan length, soil report and any surcharge — we will come back with a panel and post schedule, a structural calc and a fixed price within 24 hours.

Talk to the yard.