Skip to main content Skip to footer accreditations

Chilsworthy, Holsworthy · Built 2023

A new yard,
built for the next fifty years.

Our purpose-built precast facility opened in 2023 on the edge of Holsworthy. Bigger casting beds, in-house design, modern batching, a proper QC lab — and new jobs in a part of Devon that needed them. Browse the full range, or come and see the yard for yourself.

Mixes we cast C40/50 SR CEM I Fast-set · self-compacting

Walk the yard

Inside the Holsworthy yard.

Aerial view of the WCCP yard at Chilsworthy, near Holsworthy
The Chilsworthy yard near Holsworthy, where everything is cast, stored and loaded.
2023
Yard built
Own
Batching plant on site
To specification
Cube tested

The yard

Inside the factory.

WCCP Holsworthy yard with stacked precast box culverts
WCCP slotted 110mm drain channels, stock ready for despatch
WCCP dished drain channels in the curing bay
WCCP precast concrete panels stacked at the Holsworthy yard
WCCP free-standing precast wall section in the yard
WCCP king-post precast retaining wall in position on a Devon site
Long rows of precast slurry channels stacked four-high at the WCCP yard with factory building behind, Chilsworthy, Devon
Rows of large precast box culvert sections standing upright in the WCCP yard at Chilsworthy, Devon
Rows of precast cattle drinking troughs stacked on pallets in the WCCP yard at Chilsworthy, Devon
Prestressed concrete panels stacked with colour-coded markings at the WCCP yard, Chilsworthy, Devon

What's on site

Capability, plain and listed.

Heavy-duty casting beds

Long-line prestressing beds for wall panels up to 12m. Steel-fixed batters and moulds for cubicles, troughs and bespoke units.

In-house CAD & design

In-house CAD, with downloadable 2D blocks for the major product families. We draw the unit we are going to cast — the design of the permanent works stays with your engineer. We accept DWG, DXF, PDF and sketches.

Own batching plant

On-site batching in compliance with applicable British Standards. CEM I mixes from C32/40 through to C50/60, plus fast-set and self-compacting variants. Sulphate-resisting and low-permeability mixes for slurry, silage and marine work.

Rebar & welding in-house

Cut-and-bend rebar facility (8–16mm diameter) and welding workshop on site. Reinforcement options: rebar, mesh, fibre, prestressed strand — or none where the product doesn't call for it.

Delivery to site

Delivery arranged nationwide on 32-tonne artics and rigids. Pre-call before delivery. Customer arranges unloading.

QC laboratory

Cube testing to the standard's required frequency. Batch records available on request, including with delivery.

Finishes

Smooth, textured and tamped finishes as standard. Specification sheets available as PDF for every product line.

Circular-economy site

Solar PV, LED lighting, water recycling, rainwater harvesting, concrete waste recycled back to aggregate. Co-located with the Severn Trent anaerobic digestion plant.

Next door: Severn Trent biogas

On the same lane as Severn Trent's biogas plant.

Our Chilsworthy site is built on the same lane as Severn Trent Green Power's Holsworthy biogas plant — a food-waste anaerobic digestion plant run by Severn Trent Green Power. The neighbour relationship is a circular-economy story: food-waste digestate one side of the fence, precast concrete the other.

Concrete is one of the most carbon-intensive materials in construction. Sitting next door to renewable energy isn't a fix on its own — but it's a real start, and a sensible one.

Sustainability & accreditations
Precast units stacked in the WCCP yard

Open to visitors by appointment

Book a factory tour.

Bring your drawings, your engineer, or just yourself. We'll show you round, talk through your job, and stand the kettle on.

Call WhatsApp Quote