King Post Retaining Wall Systems — Devon Manufacturer.
UC posts and infill, sized to your surcharge.
A king post retaining wall is built from steel UC posts driven or socketed at fixed centres with precast concrete panels slotted between. WCCP supplies the panel infill — 80, 100, 150 or 180 mm (3in, 4in, 6in or 7in) thick — sized to your post centres and surcharge.
King-post retaining walls — UB/UC steel posts socketed into pad foundations at 2.4m (7'10") centres, with prestressed concrete infill panels stacked between. Heights to 6.0m (19'8"), surcharge ratings up to 60 kN/m² with the right post and footing, including HA traffic loading (LM1). Designed to BS EN 1992-1-1 (Eurocode 2) and BS EN 1993 (Eurocode 3) for the steelwork. Lead time 3-5 weeks.
- · UB / UC posts
- · 2.4m (7'10") centres
- · Heights to 6.0m (19'8")
- · Up to 60 kN/m²
- · LM1 traffic load
- · 3–5 week lead
Specification
Posts, panels and surcharge ratings.
Catalogue post sizes for typical surcharges. Site-specific design always to BS EN 1992-1-1 and BS EN 1993-1-1.
| Post section | Spacing | Max height | Panel | Surcharge | Typical use |
|---|---|---|---|---|---|
| 203×133 UB30 | 2.4m c/c (7'10") | 2.5m (8'2") | 150mm (6in) prestressed | 15 kN/m² | Light agricultural retention |
| 254×146 UB37 | 2.4m c/c (7'10") | 3.5m (11'6") | 180mm (7in) prestressed | 25 kN/m² | Bulk storage, silage, push walls |
| 305×165 UB46 | 2.4m c/c (7'10") | 4.5m (14'9") | 180mm (7in) prestressed | 40 kN/m² | Civils retention, road schemes |
| 356×171 UB57 | 2.4m c/c (7'10") | 5.5m (18'1") | 280mm (11in) prestressed | 50 kN/m² | Heavy civils, deep retention |
| 203×203 UC60 | 2.4m c/c (7'10") | 6.0m (19'8") | 280mm (11in) prestressed | 60 kN/m² | Maximum surcharge, surcharged backfill |
| 254×254 UC73 | 2.4m c/c (7'10") | 6.0m (19'8") | 280mm (11in) prestressed | 60 kN/m² + LM1 | Highway surcharge, deep retention |
Where they go
Common applications.
From a 2-metre (6'7") silage clamp wall to a 6-metre (19'8") highway retention scheme, the king-post system flexes by post and panel.
- ·Highway retention with HA traffic surcharge (LM1)
- ·Silage clamp side walls with vehicle loading on top
- ·Bulk-storage and grain bay divisions
- ·Recycling-yard push walls and waste-transfer bays
- ·Boundary and security walls on commercial sites
- ·Slurry-store walls on civils-grade post and panel
- ·Cut-and-fill retaining on residential developments
Standards & references
Engineered to current code.
- BS EN 14992
- Precast wall elements — panels manufactured to BS EN 14992.
- BS EN 1992-1-1 (Eurocode 2)
- Concrete structural design — panel and footing calculation.
- BS EN 1993-1-1 (Eurocode 3)
- Steel structural design — post sizing, bending and shear check.
- BS EN 1090
- Steel fabrication — execution class EXC2 standard.
- BS 8500-1:2023
- Concrete spec — DC-3/DC-4 mixes for aggressive ground.
Configure your king-post wall
Send section and surcharge — we will spec posts, panels and footing.
Related products
Often ordered alongside.
Common questions
What people ask about king-post walls.
Five questions we answer most weeks. If yours is not here, ring the yard.
How does a king-post wall work? +
Steel UB or UC posts are set into pre-cast concrete pockets in a strip footing, typically 2.4m (7'10") centres. Prestressed concrete panels slide down the post web from the top, locking into channel formed by the post flanges. The result is a fast-build, highly engineered retaining wall with the post taking the bending and the panels carrying the lateral pressure.
What surcharge can I run? +
Up to 60 kN/m² with a 254×254 UC73 post on a 1.2m (3'11") strip footing — that covers HA traffic loading (LM1) and most civils applications. Lighter loadings use smaller posts; we size each scheme to the loading.
How fast does it go up? +
Once the footings are cured, a four-man crew with a 35-tonne (77,161 lb) crane will set 30–40 panels a day. A 50-metre (~164ft) run of 4.5m (14'9") wall typically goes up in three days. Faster than cast-in-situ by a long way.
Do you supply the posts? +
Yes — supply-only or with the panels as a package. We cut, drill, paint and ship to site to the same lead time as the panels. Galvanised finish available.
What about settlement and heave? +
The strip footing is designed for the bearing of the host ground; on poor ground we will recommend a wider footing or a piled solution. Free advice on the foundation design from our in-house team — send us the soil report.
How would you like it?
Supply-only or fitted — King Post Walls
Supply only
Per-unit / per-metre supply
Lead time: 3–4 weeks
- UB/UC posts cut, drilled and painted (S355)
- Prestressed panels to BS EN 14992
- Designer-stamped Eurocode 2 + 3 calcs
- Delivery on our HIAB to your site
- Strip-footing concrete and post-pocket excavation
- On-site crane and setting labour
- Backfill, drainage and surfacing
Fitted (supply + install)
Supply + install crew
Lead time: 6–8 weeks (incl. site slot)
- Everything in supply only
- Four-man install crew with 35t crane
- Post-pocket grouting and panel-joint detailing
- Strip-footing concrete and reinforcement
- Backfill, drainage and reinstatement
.5m wall height with a 254×146 UB37. Heavier sections and HA traffic surcharge (LM1) priced individually.
BIM-ready packs
King post walls — engineer pack.
Direct downloads where available, with the rest sent direct from engineering on request. All packs versioned to BS EN 14992 / BS 5502-22 where applicable.
-
AutoCAD .dwg
RequestPlan, section and elevation — 2D drawings.
-
Revit .rfa
RequestParametric Revit family for BIM.
-
IFC4 .ifc
RequestOpen BIM exchange format.
-
PDF spec sheet .pdf
RequestSpecs, loadings, certification refs.
Need something else, or a stamped drawing? Email engineering@wccp.co.uk — typical reply within 24 working hours.
Ready to spec it?
Send section, height and surcharge. Quote and lead-time same day.