King Post Retaining Wall Systems — Devon Manufacturer.

UC posts and infill, sized to your surcharge.

A king post retaining wall is built from steel UC posts driven or socketed at fixed centres with precast concrete panels slotted between. WCCP supplies the panel infill — 80, 100, 150 or 180 mm (3in, 4in, 6in or 7in) thick — sized to your post centres and surcharge.

King-post retaining walls — UB/UC steel posts socketed into pad foundations at 2.4m (7'10") centres, with prestressed concrete infill panels stacked between. Heights to 6.0m (19'8"), surcharge ratings up to 60 kN/m² with the right post and footing, including HA traffic loading (LM1). Designed to BS EN 1992-1-1 (Eurocode 2) and BS EN 1993 (Eurocode 3) for the steelwork. Lead time 3-5 weeks.

  • · UB / UC posts
  • · 2.4m (7'10") centres
  • · Heights to 6.0m (19'8")
  • · Up to 60 kN/m²
  • · LM1 traffic load
  • · 3–5 week lead
Precast concrete king post retaining wall — West Country Concrete Products, Devon

Specification

Posts, panels and surcharge ratings.

Catalogue post sizes for typical surcharges. Site-specific design always to BS EN 1992-1-1 and BS EN 1993-1-1.

Post section Spacing Max height Panel Surcharge Typical use
203×133 UB30 2.4m c/c (7'10") 2.5m (8'2") 150mm (6in) prestressed 15 kN/m² Light agricultural retention
254×146 UB37 2.4m c/c (7'10") 3.5m (11'6") 180mm (7in) prestressed 25 kN/m² Bulk storage, silage, push walls
305×165 UB46 2.4m c/c (7'10") 4.5m (14'9") 180mm (7in) prestressed 40 kN/m² Civils retention, road schemes
356×171 UB57 2.4m c/c (7'10") 5.5m (18'1") 280mm (11in) prestressed 50 kN/m² Heavy civils, deep retention
203×203 UC60 2.4m c/c (7'10") 6.0m (19'8") 280mm (11in) prestressed 60 kN/m² Maximum surcharge, surcharged backfill
254×254 UC73 2.4m c/c (7'10") 6.0m (19'8") 280mm (11in) prestressed 60 kN/m² + LM1 Highway surcharge, deep retention

Where they go

Common applications.

From a 2-metre (6'7") silage clamp wall to a 6-metre (19'8") highway retention scheme, the king-post system flexes by post and panel.

  • ·Highway retention with HA traffic surcharge (LM1)
  • ·Silage clamp side walls with vehicle loading on top
  • ·Bulk-storage and grain bay divisions
  • ·Recycling-yard push walls and waste-transfer bays
  • ·Boundary and security walls on commercial sites
  • ·Slurry-store walls on civils-grade post and panel
  • ·Cut-and-fill retaining on residential developments

Standards & references

Engineered to current code.

BS EN 14992
Precast wall elements — panels manufactured to BS EN 14992.
BS EN 1992-1-1 (Eurocode 2)
Concrete structural design — panel and footing calculation.
BS EN 1993-1-1 (Eurocode 3)
Steel structural design — post sizing, bending and shear check.
BS EN 1090
Steel fabrication — execution class EXC2 standard.
BS 8500-1:2023
Concrete spec — DC-3/DC-4 mixes for aggressive ground.

Configure your king-post wall

Send section and surcharge — we will spec posts, panels and footing.

Related products

Often ordered alongside.

View full range

Common questions

What people ask about king-post walls.

Five questions we answer most weeks. If yours is not here, ring the yard.

How does a king-post wall work? +

Steel UB or UC posts are set into pre-cast concrete pockets in a strip footing, typically 2.4m (7'10") centres. Prestressed concrete panels slide down the post web from the top, locking into channel formed by the post flanges. The result is a fast-build, highly engineered retaining wall with the post taking the bending and the panels carrying the lateral pressure.

What surcharge can I run? +

Up to 60 kN/m² with a 254×254 UC73 post on a 1.2m (3'11") strip footing — that covers HA traffic loading (LM1) and most civils applications. Lighter loadings use smaller posts; we size each scheme to the loading.

How fast does it go up? +

Once the footings are cured, a four-man crew with a 35-tonne (77,161 lb) crane will set 30–40 panels a day. A 50-metre (~164ft) run of 4.5m (14'9") wall typically goes up in three days. Faster than cast-in-situ by a long way.

Do you supply the posts? +

Yes — supply-only or with the panels as a package. We cut, drill, paint and ship to site to the same lead time as the panels. Galvanised finish available.

What about settlement and heave? +

The strip footing is designed for the bearing of the host ground; on poor ground we will recommend a wider footing or a piled solution. Free advice on the foundation design from our in-house team — send us the soil report.

How would you like it?

Supply-only or fitted — King Post Walls

Supply only

Per-unit / per-metre supply

Lead time: 3–4 weeks

  • UB/UC posts cut, drilled and painted (S355)
  • Prestressed panels to BS EN 14992
  • Designer-stamped Eurocode 2 + 3 calcs
  • Delivery on our HIAB to your site
  • Strip-footing concrete and post-pocket excavation
  • On-site crane and setting labour
  • Backfill, drainage and surfacing

.5m wall height with a 254×146 UB37. Heavier sections and HA traffic surcharge (LM1) priced individually.

BIM-ready packs

King post walls — engineer pack.

Direct downloads where available, with the rest sent direct from engineering on request. All packs versioned to BS EN 14992 / BS 5502-22 where applicable.

Need something else, or a stamped drawing? Email engineering@wccp.co.uk — typical reply within 24 working hours.

Ready to spec it?

Send section, height and surcharge. Quote and lead-time same day.

Call WhatsApp Quote