Custom Plinths.

Cast to your engineer's schedule, not ours.

Bespoke precast plinths and equipment bases for transformers, standby generators, switchgear, BESS containers, EV chargers and process plant. C40/50 concrete to BS 8500-1:2023, manufactured under BS EN 13369 Factory Production Control. Single pieces up to 25 tonnes (about 55,115 lb).

Send us your engineer's drawing, the manufacturer schedule, the cable-entry pattern and the geotechnical data — we will return a shop drawing for sign-off and a programme that matches your DNO outage window.

We work to UKPN, NGED, Northern Powergrid, SSEN and SP Energy Networks substation schedules and direct to principal contractors on data-centre, hospital and BESS projects across England, Wales and Scotland.

  • · BS EN 13369 FPC
  • · C40/50 + DC-3/4
  • · Manufactured to harmonised BS EN standards
  • · Up to 25 t (55,115 lb)
  • · All DNO frameworks
  • · 4-6 week lead

Photo needed

Hero — completed transformer plinth on site, with cable ducts, earth bonding and lifting points visible

Specification

Common base types and weight ranges.

These are our recurring base types — every plinth we cast is bespoke, but the families below cover most of the work. Send us the engineer schedule and we will quote against your exact loading, cable-entry pattern and bund detail.

Variant Footprint Typical weight Typical use
Transformer plinth 1.5m × 1.0m up to 4.5m × 3.0m (4ft11in × 3ft3in up to 14ft9in × 9ft10in) 0.6 – 6.0 t (1,323 – 13,228 lb) 11kV / 33kV pad-mounted transformers — DNO schedules
Generator plinth 2.0m × 1.0m up to 6.0m × 2.5m (6ft7in × 3ft3in up to 19ft8in × 8ft2in) 1.0 – 8.0 t (2,205 – 17,637 lb) Standby gensets — Cat, FG Wilson, Cummins, Kohler
Switchgear / RMU base 1.0m × 0.8m up to 3.0m × 1.2m (3ft3in × 2ft8in up to 9ft10in × 3ft11in) 0.4 – 2.5 t (882 – 5,512 lb) Ring-main units, LV panels, package substations
Pump / chiller base To engineer schedule Per design M&E plant on roof or at-grade with anti-vibration
Battery / BESS base 6.0m × 2.5m up to 12.0m × 3.0m (19ft8in × 8ft2in up to 39ft4in × 9ft10in) 4.0 – 15.0 t (8,818 – 33,069 lb) Container BESS, EV charger plinths, solar inverter
Cable trough plinth Modular 1.0m (3ft3in) segments 0.3 – 0.5 t / m (661 – 1,102 lb/m) Trefoil cable runs feeding the substation plinth
Bespoke equipment base Anything we can lift and ship Up to 25 t (about 55,115 lb) single piece Manufacturer-specific schedule, non-standard plant

Cast-in items — lifting sockets, earth bonds, conduit sleeves, oil-bund kerbs, levelling shims — coordinated to your engineer's drawing. We issue a shop drawing for sign-off before we cut moulds.

Conformity documentation, mix design data and 7- and 28-day cube test results are available on request.

Where they go

Common applications.

From a single ground-mount transformer in a Cornish village to a 40-plinth BESS site in Lincolnshire, we cast against the engineer's schedule and the DNO outage window.

  • · DNO secondary substations — UKPN, NGED, NPg, SSEN, SPEN frameworks
  • · Standby diesel generator installations — hospitals, data centres, telecoms
  • · Battery energy storage system (BESS) container plinths
  • · EV ultra-rapid charger pads — Gridserve, Osprey, Instavolt
  • · Solar farm inverter and transformer skids
  • · Industrial chillers, cooling towers and air-handling plant bases
  • · Anaerobic digester pump and CHP-engine bases

Standards & references

Cast to current code.

BS EN 13369
Common rules for precast concrete products — Factory Production Control.
BS 8500-1:2023
Concrete specification — C40/50, exposure classes XC4/XF1, sulphate DC-3/DC-4.
BS EN 1992-1-1 (Eurocode 2)
Structural design of reinforced concrete — plinth slab and reinforcement design.
BS EN 61936-1
Power installations exceeding 1 kV AC — substation and oil-bund detailing.
DNO frameworks
Designed to UKPN, NGED, Northern Powergrid, SSEN and SPEN substation schedules.

Configure your plinth

Send us the engineer schedule and the manufacturer drawing — we will quote inside 48 hours.

Common questions

What contractors ask about plinths.

Five questions we answer most weeks. If yours is not here, ring the yard.

How do you size a transformer or generator plinth? +

We work to the manufacturer schedule — Schneider, ABB, Siemens for transformers; Cat, Cummins, FG Wilson for gensets. The plinth has to take the static weight, the seismic spread footing, the cable-entry duct pattern and any oil-bund detail required by BS EN 61936-1. We send a drawing for engineer sign-off before we cut moulds.

What concrete grade do you cast? +

C40/50 to BS 8500-1:2023 is our standard for plinths and equipment bases — exposure XC4/XF1 minimum. For substations we add sulphate resistance (DC-3 / DC-4 if the geotechnical report calls for it). All cast under BS EN 13369 Factory Production Control with cube tests at 7 and 28 days.

Can you cast in earthing, conduits and bund kerbs? +

Yes — every penetration, conduit, earth-rod sleeve, lifting socket and bund upstand cast in to engineer drawings. We coordinate with the principal contractor and DNO design engineer on a shop drawing before mould cutting. Late changes after mould-cut are chargeable.

Do you deliver and install? +

We deliver UK-wide on flatbed or low-loader and offload with our own HIAB up to 12 tonnes. Above that we coordinate a site mobile crane with the principal contractor. We can supply, deliver, set on a pre-prepared sub-base and grout-bed in one visit on most substation programmes.

What is the lead time? +

Civils-grade plinths run 4-6 weeks from drawing sign-off. DNO substation plinths to standard frameworks ship in 3-4 weeks if the schedule matches our existing moulds. Bespoke geometries — non-standard sizes, integrated bunds, complex penetration patterns — typically 6-10 weeks.

How would you like it?

Supply-only or fitted — Custom Plinths

Fitted (supply + install)

Supply + install crew

Lead time: 5–8 weeks (incl. site slot)

  • Everything in supply only
  • WCCP HIAB offload up to 12 tonnes (about 26,450 lb)
  • Set on prepared sub-base, levelled and grout-bedded
  • DNO terminations and electrical fit-out
  • Manufacturer commissioning of plant

. Substation and BESS programmes priced per scheme — send the engineer schedule and we will respond with a fixed quote and dates.

Ready to spec it?

Send us the engineer's drawing and the DNO outage date — we will quote, programme and cast.