Feed-Stop Walling.
Steel where it scrapes. Concrete where it sits.
3m precast feed-stop wall units with a galvanised steel lip cast into the top edge — the part the tractor bucket scrapes against every feeding round. Cast in sulphate-resisting C40/50 concrete to BS 8500-1:2023. SSAFO 2018-compliant. Catalogue lead time 2-4 weeks.
A feed-stop wall is the upright concrete face of a silage clamp — the part the loader bucket scrapes when taking the next feed cut. WCCP feed-stops cast a 6 mm × 100 mm (¼in × 4in) galvanised steel lip into the top edge so the wear hits the steel, not the concrete. Design life 25+ years versus 8 for bare concrete.
We cast, deliver and install across England and Wales — the right answer for new silage clamps, AD feedstock storage, and SSAFO 2018 refurb work.
- · Galvanised steel lip
- · Sulphate-resisting C40/50
- · 3m (9'10") standard length
- · SSAFO 2018-compliant
- · 25+ year design life
- · 2–4 week lead
📷 Photo needed
Hero shot — feed-stop wall on a working silage clamp showing the galvanised steel lip across the top, ideally with a tractor bucket in shot
Specification
Heights, lengths and lip detail.
Catalogue 3m units in three standard heights. Bespoke corners, taller faces and AD feedstock walls quoted on application.
| Variant | Dimensions | Detail | Typical use |
|---|---|---|---|
| Standard Feed-Stop 3m × 1.2m | 3000 × 1200 × 200mm (9'10" × 3'11" × 8in) | Galvanised steel lip cast in | Silage clamp face — dairy and beef |
| Tall Feed-Stop 3m × 1.5m | 3000 × 1500 × 200mm (9'10" × 4'11" × 8in) | Galvanised steel lip cast in | Deep clamp face / maize silage |
| Short Feed-Stop 3m × 0.9m | 3000 × 900 × 200mm (9'10" × 2'11" × 8in) | Galvanised steel lip cast in | Smaller clamps / wholecrop |
| Corner Feed-Stop | Bespoke L-profile | Mitred junction · steel lip continuous | Clamp ends and L-junctions |
| Tractor-Bucket Wear Plate | Galv. lip section only | Bolted-on retrofit lip | Refurbishing existing concrete walls |
The galvanised steel lip is hot-dip to BS EN ISO 1461 — typically 85 microns coating — cast in with shear studs at 300mm (1ft) centres for permanent bond to the concrete.
The range
Feed-stop walling in service.
📷 Photo needed
Run of feed-stop walls on a working dairy silage clamp — face-on view
📷 Photo needed
Close-up of galvanised steel lip cast into the top edge
📷 Photo needed
Tractor bucket scraping against the steel lip during feeding
📷 Photo needed
Corner feed-stop unit at clamp end junction
📷 Photo needed
Cross-section drawing showing lip, shear studs and reinforcement
📷 Photo needed
Strip foundation and dowel-bar joint detail before unit set
📷 Photo needed
Tall (1.5m) feed-stop wall on an AD feedstock clamp
📷 Photo needed
Yard storage — feed-stop units stacked at Holsworthy ready to despatch
Where they go
Common applications.
From a 1500-tonne dairy clamp in Devon to a 6000-tonne AD feedstock store in the Midlands, the feed-stop unit is the same — it is the lip that earns its keep.
- · New silage clamps on dairy and beef holdings
- · SSAFO 2018 refurb work where existing walls have failed
- · Maize and wholecrop clamps with heavy roll-off pressure
- · Anaerobic digester feedstock storage clamps
- · Drive-over silage pads with low retaining walls
- · Effluent channel kerb where the loader scrapes
- · Any clamp face where a tractor bucket meets concrete daily
Standards & references
Cast and detailed to current best practice.
- SSAFO Regulations 2018
- Silage, Slurry & Agricultural Fuel Oil — clamp construction and effluent containment.
- BS 5502-22:2003
- Buildings and structures for agriculture — silage and feed storage.
- BS 8500-1:2023
- Concrete specification — sulphate-resisting C40/50 mix for silage effluent.
- BS EN 14992
- Precast concrete wall elements — structural performance and CE marking.
- BS EN ISO 1461
- Hot-dip galvanising — coating thickness on the steel wear lip.
Configure your clamp face
Send clamp dimensions and silage type — we will quote inside 24 hours.
Common questions
What people ask about feed-stop walling.
Five questions we answer most weeks. If yours is not here, ring the yard.
What is the steel lip for? +
Silage clamp faces are abused. Every day a tractor bucket scrapes the top of the wall taking the next feed cut. Without a steel lip the concrete chips, then crumbles, and within five years you have a half-rotten wall. The galvanised lip — typically 6mm (about ¼ inch) thick, 100mm (4 inches) tall — takes the wear and saves the concrete underneath. WCCP feed-stop walls last 25+ years where bare concrete walls last 8.
What concrete spec do you use? +
Sulphate-resisting C40/50 to BS 8500-1:2023. Silage effluent is acidic — pH 3.5 to 4.5 — and standard concrete dissolves in it. The sulphate-resisting mix plus a 50mm (2 inch) cover to the steel gives a design life of 50+ years for the buried portion.
Free-standing or anchored? +
Both. Standard 3m units are free-standing on a 600mm × 200mm (2ft × 8in) reinforced strip foundation, locked together with cast-in dowel bars. For taller clamps and AD feedstock walls we anchor to a continuous toe slab. Either way the design is signed off by our consulting engineer.
How are they delivered? +
On our HIAB lorry — a 3m × 1.2m (9'10" × 3'11") unit weighs about 1.7 tonnes (roughly 3,750 lb), so we lift straight off onto the prepared base. We deliver UK-wide; site access for an articulated HIAB needs about 4m (13'1") clear width and a hard standing within 12m (39'4") of the wall line.
What is the lead time? +
Catalogue 3m feed-stop units run 2 to 4 weeks. Bespoke heights and corner pieces 4 to 6 weeks. Major SSAFO 2018 refurbs with engineering design run 6 to 10 weeks for the design-and-cast cycle.
How would you like it?
Supply-only or fitted — Feed-Stop Walling
Supply only
Per-unit / per-metre supply
Lead time: 2–4 weeks
- 3m (9'10") precast feed-stop units — sulphate-resisting C40/50
- Galvanised steel lip cast in (6mm × 100mm / ¼in × 4in)
- Foundation and joint details on the install drawing
- Delivery on our HIAB to your slab
- Strip foundation construction
- On-site setting / fixing labour
Fitted (supply + install)
Supply + install crew
Lead time: 4–6 weeks (incl. site slot)
- Everything in supply only
- Two-man install crew with HIAB
- Dowel-bar joint setting and bedding-mortar
- Strip foundation and reinforced toe slab
- Effluent channel and drainage works
. Bespoke heights, AD feedstock walls and full SSAFO 2018 refurb packages priced individually — send clamp dimensions and we'll come back within a working day.
Ready to spec it?
Send us clamp dimensions, silage type and a sketch. Quote and lead-time same day.