Areas served · Somerset
Precast concrete supplier in Somerset.
Cast in North Devon. On your slab in days.
WCCP delivers precast concrete across Somerset from our Holsworthy yard, a half-day's run away via the M5. Common Somerset precast jobs: slurry stores for Levels dairies, silage clamp walls and retaining walls for M5 civils. Lead times: 2–3 weeks for catalogue items, 4–6 weeks bespoke. Recent deliveries: Taunton, Bridgwater and Yeovil.
- Made in North Devon since 1973
- BSI Kitemark ready-mixed concrete
- Manufactured to BS EN 14992
- UK-wide & European delivery
From the yard
Holsworthy to Taunton: roughly 60 miles.
Typical delivery 2–3 days from order on catalogue items. Own HIAB lorries — kit lands where it's needed.
- Taunton ~60 mi
- Bridgwater ~75 mi
- Yeovil ~75 mi
Why Somerset farms and contractors choose WCCP
From the Levels to the Mendips.
Somerset Levels dairy
SSAFO-compliant slurry stores, cubicles and silage clamp walls sized for Levels herds.
M5 corridor and Hinkley
Trusted into the Hinkley Point C connections supply chain and M5 corridor schemes for engineered retaining walls and box culverts.
Quantocks and Exmoor edge
Tight rural lanes and steep drives are routine — we recce in advance and switch from artic to rigid 8-wheeler where access demands it.
Architects and self-builders
Eurocode 6 padstones and prestressed panels for new-build steel frames across South Somerset.
What we cast
Most ordered in Somerset.
Dairy on the Levels, beef in the hills, civils along the M5.
Common questions
Delivering to Somerset.
Do you deliver across all of Somerset? +
Yes — from the Quantocks down to the Mendips and across the Levels. The M5 puts most of Somerset within a half-day's run from Holsworthy.
Do you deliver to the Quantocks and Exmoor edge? +
Yes. Tight lanes are normal — we'll do a recce on borderline access before the first load and switch to a rigid 8-wheeler instead of an artic where it's needed.
Do you supply the Somerset Levels dairy farms? +
Regularly. Slurry stores, cubicles and silage clamp walls — all to SSAFO 2018 spec where applicable.
Lead time to Taunton? +
Catalogue items 2–3 weeks. Bespoke and engineered items quoted from drawings — typically four to six weeks from approved design.
Made for Somerset farms and civils.
Send a drawing or just describe the job. We'll quote inside a working day.