Areas served · Exeter
Precast concrete supplier in Exeter.
Cast in North Devon. On site in days.
WCCP delivers precast concrete to Exeter from our Holsworthy yard, an hour away via the A30. Common Exeter precast jobs: padstones for new-build steel frames, retaining walls for M5-corridor civils and cattle cubicles for Mid Devon dairies. Lead times: 2–3 weeks for catalogue items, 4–6 weeks bespoke. Recent deliveries: Crediton, Tiverton and Cullompton.
- Made in North Devon since 1973
- BSI Kitemark ready-mixed concrete
- Manufactured to BS EN 14992
- UK-wide & European delivery
From the yard
Holsworthy to Exeter: roughly 40 miles.
Straight run east along the A30 — Okehampton, Whiddon Down, into the M5 corridor at Exeter. Typical delivery 2–3 days from order on catalogue items. We run our own HIAB-equipped lorries, no third-party haulier.
- Exeter city centre ~40 mi
- Crediton ~30 mi
- Tiverton ~38 mi
- Cullompton ~45 mi
Why Exeter contractors and farms choose WCCP
An hour west, on the A30.
M5 / A30 main contractors
Supplying principal contractors with engineered retaining walls and box culverts for M5/A30 corridor and Devon infrastructure schemes.
Mid Devon dairy
Crediton and Tiverton dairies — high-yield cubicles and SSAFO-compliant slurry stores sized to herd.
Architects and self-builders
Eurocode 6 padstones cast to your beam schedule — usually inside three weeks. Self-build basements get king-post wall systems.
No haulier guesswork
Own HIAB lorries, own drivers — kit lands where the bricklayer needs it on day one, not day three.
Areas covered
Exeter and the M5 corridor.
City-centre civils right out to the Mid Devon farms.
- · Crediton
- · Tiverton
- · Cullompton
- · Honiton
- · Ottery St Mary
- · Topsham
- · Exmouth
- · Dawlish
- · Newton Abbot
- · Okehampton
What we cast
Most ordered around Exeter.
Dairy and beef cubicle sheds across Mid Devon, plus steady civils flow into the M5/A30 schemes.
Common questions
Delivering to Exeter.
Do you deliver to Exeter and Mid Devon? +
Yes — Exeter is roughly 40 miles from our Holsworthy yard via the A30. Catalogue loads usually land within 2–3 working days, on our own HIAB-equipped lorries. We run loads to Crediton, Tiverton and Cullompton every week.
Can you reach farms on Exmoor and the Blackdowns? +
Yes. Tight lanes and steep drives are normal for us — we will switch from artic to a rigid 8-wheeler where access is borderline, and we recce difficult sites before the first load.
Lead time for Exeter jobs? +
Catalogue items 2–3 weeks. Bespoke and engineered precast quoted from drawings — typically four to six weeks from approved design. Padstones to a beam schedule we can usually turn around inside three weeks.
Do you supply Exeter-based main contractors? +
Yes. We supply precast retaining walls, padstones, headwalls and bespoke civils items to principal contractors working on M5/A30 corridor schemes and infrastructure projects across Devon.
Cast in North Devon, delivered to Exeter.
Send a drawing or just describe the job. We'll quote inside a working day.